Construction Updates at Bellevue Independent Schools

A Breath of Fresh Air

Robb Smith - 9/24/2021 3:53:00 PM

Though major construction progress continues throughout our schools, we often hit periods of time where no tangible progress can be seen. Today, however, I was encouraged to see progress taking shape as I walked the third floor of BHS. This newly installed ductwork will house our new fresh air filtration system, improving air quality in our classrooms. 

I commend our students for their patience, curiosity, and positive attitudes toward these projects as we continue the necessary work to improve our buildings. It is my hope that, in watching the transformation firsthand, our students will share the pride that I feel as we move closer to a better Bellevue.

BHS hallway with new ductwork

#LoveTheVue